Per-room leak sensors
Quantity, exact model and supported function are selected for your project.
Regional product & source review →Name each water-risk location and its maintenance contact.
Canada-led operations. Your project stays with its country team.

An alert from several bathrooms does not identify which room needs attention.
Map each sensor to room and risk point, run a wet test one location at a time, and verify the notification names match the asset register.
Name each water-risk location and its maintenance contact.
These are candidate devices and work items, not a pre-tested fixed kit or a stock promise.
Quantity, exact model and supported function are selected for your project.
Regional product & source review →Quantity, exact model and supported function are selected for your project.
Regional product & source review →Quantity, exact model and supported function are selected for your project.
Regional product & source review →| Equipment / work item | Quantity logic | Before ordering |
|---|---|---|
| Sensing points | One sensor per selected independent bathroom water-risk point | Validate the measured function, placement, environmental rating and alert path. |
| Hubs & control domains | hubs by verified coverage | Verify device support, radio coverage, capacity and account isolation. |
| Project scope / optional items | room labels and tests per sensor | Confirm the actual regional model, installation conditions and agreed project scope. |
One sensor per selected independent bathroom water-risk point; hubs by verified coverage; room labels and tests per sensor.
Per-unit location and permission register, named response responsibilities, turnover or maintenance checklist and project-specific candidate BOM.


Planning illustration based on this scenario. The final model selection, function testing and site drawing are agreed for your project.
Confirm regional SKU and supplier, wiring/voltage and local requirements, firmware and protocol roles, supported bridge functions, manual operation, privacy and install permissions. The diagram is a planning aid; the final project documents take precedence.
Canada is quoted in CAD; United States projects in USD. Supplier, exact SKU, stock, lead time, warranty and installation coverage remain to be confirmed. No regional availability is inferred from an international manufacturer page.
US manufacturer catalog ↗ · Canada catalog reference ↗
Licensed setting · illustrativeProperty staff may not learn about a leak inside an occupied unit soon enough.
Licensed setting · illustrativeKitchen fan switching is confusing, and its electrical requirements are unclear.
Licensed setting · illustrativeKitchen work areas have uneven brightness during meal preparation.
Get a conversation about the right equipment, a defined system scope and the support your team needs.
Canada-led operations. Your project stays with its country team.
Canada-led operations · Canadian inquiries → Canada team · US inquiries → US team.
+86 13162319758