Aqara H2 / Lutron Caseta candidate
Quantity, exact model and supported function are selected for your project.
Regional product & source review →Survey wiring before selecting a supported regional switch.
Canada-led operations. Your project stays with its country team.

An older switch box may not contain a neutral conductor.
Have an electrician inspect neutral, box space, load and multi-way wiring, then test a compliant candidate on a representative circuit.
Survey wiring before selecting a supported regional switch.
These are candidate devices and work items, not a pre-tested fixed kit or a stock promise.
Quantity, exact model and supported function are selected for your project.
Regional product & source review →Quantity, exact model and supported function are selected for your project.
Regional product & source review →| Equipment / work item | Quantity logic | Before ordering |
|---|---|---|
| Site survey / diagnosis | One surveyed record per switch location | Record actual site conditions before selecting replacement hardware. |
| Project scope / optional items | control per verified independent circuit | Confirm the actual regional model, installation conditions and agreed project scope. |
| Project scope / optional items | additional wiring or load accessories only when explicitly approved | Confirm the actual regional model, installation conditions and agreed project scope. |
One surveyed record per switch location; control per verified independent circuit; additional wiring or load accessories only when explicitly approved.
Existing-condition survey, room device-position plan, reversible-work or wiring scope, commissioning checklist and itemized candidate BOM.


Planning illustration based on this scenario. The final model selection, function testing and site drawing are agreed for your project.
Confirm regional SKU and supplier, wiring/voltage and local requirements, firmware and protocol roles, supported bridge functions, manual operation, privacy and install permissions. The diagram is a planning aid; the final project documents take precedence.
Canada is quoted in CAD; United States projects in USD. Supplier, exact SKU, stock, lead time, warranty and installation coverage remain to be confirmed. No regional availability is inferred from an international manufacturer page.
US manufacturer catalog ↗ · Canada catalog reference ↗
Licensed setting · illustrativeA customer wants to try connected control without a large initial commitment.
Licensed setting · illustrativeA replacement smart lock may not fit the existing door preparation.
Licensed setting · illustrativeThe customer wants smart curtains after the room has already been finished.
Get a conversation about the right equipment, a defined system scope and the support your team needs.
Canada-led operations. Your project stays with its country team.
Canada-led operations · Canadian inquiries → Canada team · US inquiries → US team.
+86 13162319758